From: Thatcher W. Kezer
Sent: Monday, November 1, 2021 5:04 PM
To: Andrew Cummings <andrew.cummings@timrenzi.net>; Meghan Todd <meghanltodd@gmail.com>; sgoldsteinma <sgoldsteinma@gmail.com>; Tyler Terrasi <t_terrasi@yahoo.com>; Rose Quinn <rquinn@mwcil.org>; Ricky Finley <raf7162@verizon.net>; fdcsusie (null) <fdcsusie@aol.com>
Cc: Mark E. Dempsey; Kelly L. McFalls; William R. Sedewitz
Subject: School Street Sidewalk Project Update

Commission Members,

At last Wednesday’s Disability Commission meeting I was asked questions about the status of the School Street sidewalk project. Below is the response Blake Lukis provided last week on his last days as DPW Director for Framingham.

In summary, there were no curb cuts in the work zone area before the project started. DPW received a Shared Streets grant that required completion of the sidewalks this season while the street paving is scheduled for next construction season.  In the interim, DPW has provided a safe, temporary path for accessibility where none existed until the project can be completed. Once the paving is complete, all the permanent infrastructure will be ADA compliant. The entire project has the funding necessary to be completed. See attached photo of one of the curb cuts with temporary patching as an example.

Please let me know if you have any other questions on the project.

Thatcher

Thatcher W. Kezer III
Chief Operating Officer
City of Framingham
150Concord Street
Framingham MA 01702
508.532.5400
tkezer@framinghamma.gov

Blake’s response:

Prior to June 2021, the section of School Street between Hamilton Street and Old Connecticut Path contained 7 crosswalks which had no curb cuts at all.  These crosswalks were located at the intersections of Colby Ave., Fenwood St., Meadow St., Cottage St., North St., and two in the vicinity of St. George Church.

To help correct this lack of accessibility, the City applied for a Shared Street grant to help fund the replacement of the sidewalks and installation of appropriate curb cuts at all crosswalks.  The City was successful in obtaining a $200,000 grant to perform this work, however, the timeframe to use the grant funding was short and the work had to be completed this construction season.  Unfortunately, we were not able to rearrange the paving schedule to pull the paving portion of this project into the current construction season, leaving it as an outstanding portion of the project until the 2022 construction season.  I will note, however, that the paving portion of the project is fully funded through the annual roadway program and no additional approval or appropriations are necessary.  This is strictly a timing issue.

Ideally, we would have performed the sidewalk work within the same season as the paving to ensure a complete project within the same construction season.  Unfortunately to take advantage of the grant funding we chose to split the project up over two seasons.  To bridge the gap in this interim period between sidewalk installation and paving, we have installed temporary paving by all of the new curb cuts and will maintain accessibility until we can get the paving complete.

The guidelines for safe vehicle and pedestrian travel through work zones is set forth in the U.S. Department of Transportation Federal Highway Administrations Manual on Uniform Traffic Control Devices for Streets and Highways.  Chapter 6D of this manual states that “If the previous pedestrian facility was accessible to pedestrians with disabilities, the footpath provided during temporary traffic control should also be accessible.”  Since the pedestrian facility (sidewalks in this case) previously did not meet compliance due to the lack of curb cuts, then the temporary sidewalks also do not.  That said, we have done our best to provide an interim solution which provides accessibility.

One Framingham – Focused on the Future

Please be advised that the Massachusetts Secretary of State considers e-mail to be a public record, and therefore subject to public access under the Massachusetts Public Records Law,M.G.L. c. 66 § 10.

Blow this shit up:

  • Tweet
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • Click to share on Nextdoor (Opens in new window) Nextdoor

Post navigation

Attention to all non-diverse or white-male applicants to jobs in the City of Framingham, Policy #44 & hiring manager trainings, almost guarantee that you will not get the job.
FOIA DUMP: Veterans Park Ceremony

Leave a Reply Cancel reply

You must be logged in to post a comment.

Try our 100% Anonymous Tip Submission System.

100% Anonymous
100% Guaranteed
100% of the time!

Recent Posts

  • Land Deal in Limbo: Zani Family Owns Far Less Than Expected in Tri-City Open Space Project May 15, 2025
  • MEAT TEMPERATURES IN THE DANGER ZONE, FREEZER REGISTERED AT 50 DEGREES. May 7, 2025
  • Drury Children Struck Down in Storm May 6, 2025
  • CRISPUS WHO? May 6, 2025
  • “I Suppose I’ll Have to Go to the Electric Chair” May 5, 2025

Recent Comments

  • After being caught illegally operating as a nightclub, and denying that they were a nightclub in their hearing, Cafe Belo seeks to change their entertainment license to become a full fledged nightclub. – This is FU on Cafe Belo at site of old Angry Ham’s, faces license revocation hearing after operating as a nightclub, overcrowding, without regard for public safety standards
  • Raising Cane’s Chicken Fingers Is Opening in Framingham – Northeast Restaurant Group on Chicken Wars coming soon to Cochituate Road
  • A second ‘agri-hood’ in the works for Eastleigh owner Doug Stephan – This is FU on ARCHITECTURAL PLANS & NARRATIVE: It’s a beautiful day in Doug’s $100,000,000 Agrihood…
  • FOIA DUMP: Municipal Aggregation Hearing Transcript – This is FU on City Council & Sustanability Committee seek to Rip-Off it’s Poorest Residents so in order to make some of it’s Richest & Most Influential ones… Look Greener!
  • Framingham man faces years in prison after threatening to kill Jewish children and to bomb temples. – This is FU on Man calling in threats to synagogue had Framingham ties. A past of homicidal ideation, crimes, and assaults.

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Powered by WordPress Theme: X Blog Free by WP Theme Space.
Exit mobile version